IAC logo
IAC Assessment: WI0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product STAINLESS STEEL CASTINGS
NAICS n/a
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $575,568 11,001,466 kWh $0.05
Natural Gas $154,847 43,395 MMBtu $3.57
TOTAL ENERGY COSTS $730,415
RECOMMENDED SAVINGS* $12,899 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,333
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,497
Cost:
$17,166
$6,497 - - - $6,497
-
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$208
Cost:
$300
$208 4,103 - - $208
4,103
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,614
Cost:
$1,003
$1,614 30,774 - - $1,614
30,774
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,828
Cost:
-
$1,828 34,877 - - $1,828
34,877
kWh
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$801
Cost:
$400
$801 15,240 - - $801
15,240
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$880
Cost:
$1,000
$880 16,706 - - $880
16,706
kWh
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$594
Cost:
$800
- - $594 166 -
-
kWh
$594
166
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$241
Cost:
$250
- - $241 68 -
-
kWh
$241
68
MMBtu
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$236
Cost:
-
$236 - - - $236
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,899
Cost:
$20,919
$12,064 101,700 $835 234 $12,064
101,700
kWh
$835
234
MMBtu
TOTAL IMPLEMENTED Savings:
$4,333
Cost:
$3,503
$3,739 66,823 $594 166 $3,739
66,823
kWh
$594
166
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas