IAC logo
IAC Assessment: WI0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product COMMERCIAL COOKING EQUIPMENT
NAICS n/a
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,800
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,932 599,941 kWh $0.09
Natural Gas $32,998 13,636 MMBtu $2.42
TOTAL ENERGY COSTS $86,930
RECOMMENDED SAVINGS* $19,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,593
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,155
Cost:
$5
$1,763 19,637 - - $(-608) - $1,763
19,637
kWh
-
-
MMBtu
$(-608)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,584
Cost:
$600
$2,584 28,722 - - - - $2,584
28,722
kWh
-
-
MMBtu
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$6,261
Cost:
-
$6,261 69,754 - - - - $6,261
69,754
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,333
Cost:
$1,000
- - $1,333 551 - - -
-
kWh
$1,333
551
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,046
Cost:
$640
$1,046 11,723 - - - - $1,046
11,723
kWh
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,854
Cost:
-
- - $3,854 1,593 - - -
-
kWh
$3,854
1,593
MMBtu
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,294
Cost:
$500
$2,294 - - - - - $2,294
-
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$574
Cost:
-
$574 6,448 - - - - $574
6,448
kWh
-
-
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$154
Cost:
$466
- - $154 64 - - -
-
kWh
$154
64
MMBtu
-
-
$
10: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$320
Cost:
$500
$320 3,517 - - - - $320
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,575
Cost:
$3,711
$14,842 139,801 $5,341 2,208 $(-608) - $14,842
139,801
kWh
$5,341
2,208
MMBtu
$(-608)
-
$
TOTAL IMPLEMENTED Savings:
$7,593
Cost:
$605
$4,347 48,359 $3,854 1,593 $(-608) - $4,347
48,359
kWh
$3,854
1,593
MMBtu
$(-608)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes