IAC logo
IAC Assessment: WI0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Finishing Operations
NAICS n/a
SIC 2675 - Die-cut Paper And Board
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 61,895
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,151 1,500,642 kWh $0.03
Electricity Demand $36,588 4,421 kW-months/year $8.28
Electricity Fees $4,120 - $ -
Natural Gas $2,818 500 MMBtu $5.64
TOTAL ENERGY COSTS $102,357
RECOMMENDED SAVINGS* $117,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $814
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$104,000
Cost:
$4,000
- - - - - - $104,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$104,000
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,857
Cost:
$10,000
- - $7,857 900 - - - - - - -
-
kWh
$7,857
900
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,503
Cost:
$1,500
$937 27,648 $566 65 - - - - - - $937
27,648
kWh
$566
65
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$838
Cost:
$3,744
$605 17,856 $233 27 - - - - - - $605
17,856
kWh
$233
27
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$211
Cost:
$300
$211 6,210 - - - - - - - - $211
6,210
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$1,277
Cost:
-
- - - - - - - - $1,277 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,277
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$738
Cost:
$2,000
$409 12,058 $329 38 - - - - - - $409
12,058
kWh
$329
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$605
Cost:
$640
$436 12,872 $169 19 - - - - - - $436
12,872
kWh
$169
19
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$209
Cost:
$400
- - - - $209 37 - - - - -
-
kWh
-
-
kW-months/year
$209
37
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$117,238
Cost:
$22,584
$2,598 76,644 $9,154 1,049 $209 37 $104,000 - $1,277 - $2,598
76,644
kWh
$9,154
1,049
kW-months/year
$209
37
MMBtu
$104,000
-
$
$1,277
-
$
TOTAL IMPLEMENTED Savings:
$814
Cost:
$1,040
$436 12,872 $169 19 $209 37 - - - - $436
12,872
kWh
$169
19
kW-months/year
$209
37
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes