Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 112 | Animal Production and Aquaculture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0411 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,097 | $504 | Implemented |
SF0411 # 03 Y:2012 | 03 | 2012 | SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY | $716 | $0 | Implemented |
SF0411 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,666 | $1,200 | Implemented |
SF0411 # 06 Y:2012 | 06 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,094 | $939 | Implemented |
SF0411 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $18,497 | $47,901 | Implemented |
SF0411 # 12 Y:2012 | 12 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,986 | $135,330 | Implemented |
SF0411 # 01 Y:2012 | 01 | 2012 | COMBINE UTILITY METERS | $35,266 | $0 | Implemented |
OR0576 # 01 Y:2011 | 01 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,860 | $1,000 | Implemented |
UM0283 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,568 | $6,878 | Implemented |
UM0283 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,024 | $300 | Implemented |
UM0283 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,056 | $2,500 | Implemented |
AS0381 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $738 | $30 | Implemented |
AS0381 # 05 Y:2004 | 05 | 2004 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $396 | $30 | Implemented |
AS0381 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,379 | $74,008 | Implemented |
AS0381 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,696 | $45 | Implemented |
AS0372 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,480 | $10,717 | Implemented |
AS0372 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,394 | $17,193 | Implemented |
IA0336 # 01 Y:2004 | 01 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,854 | $4,300 | Implemented |
IA0336 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,930 | $20,000 | Implemented |
IA0336 # 03 Y:2004 | 03 | 2004 | REPLACE BOILER | $27,684 | $150,000 | Implemented |
IA0336 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $199 | $80 | Implemented |
IA0336 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $499 | $400 | Implemented |
IA0336 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,139 | $1,364 | Implemented |
IA0336 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $1,197 | Implemented |
AS0369 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $155 | $240 | Implemented |