Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 212 | Mining (except Oil and Gas) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0193 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $946 | $3,500 | Not Implemented |
UU0193 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,736 | $1,307 | Implemented |
UU0193 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $371,933 | $40,000 | Implemented |
UU0193 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,764 | $4,720 | Implemented |
UU0193 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,875 | $5,000 | Implemented |
UU0193 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $269,225 | $7,636,800 | Implemented |
UU0145 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $4,719 | Implemented |
UU0145 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $25,041 | $5,000 | Not Implemented |
UU0145 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $47,010 | $23,850 | Not Implemented |
UU0145 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,566 | $36,000 | Implemented |
UU0145 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $373,488 | $10,000 | Not Implemented |
UU0145 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $377,567 | $872,000 | Not Implemented |
UU0145 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $661 | $440 | Implemented |
OR0423 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $518,000 | $300,000 | Not Implemented |
OR0423 # 02 Y:2002 | 02 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $489,000 | $410,000 | n/a |
OR0423 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $183,000 | $120,860 | Not Implemented |
OR0423 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,800 | $20,700 | Implemented |
OR0423 # 05 Y:2002 | 05 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,900 | $0 | Implemented |
OR0423 # 06 Y:2002 | 06 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $279,200 | $2,000,000 | Not Implemented |
CO0516 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,370 | $2,480 | Implemented |
CO0516 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $900 | Implemented |
CO0516 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,300 | $38,900 | Not Implemented |
CO0516 # 03 Y:2002 | 03 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $44,200 | $30,000 | n/a |
CO0516 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,030 | $21,080 | Implemented |
CO0516 # 01 Y:2002 | 01 | 2002 | INSTALL WIND POWERED ELECTRIC GENERATOR | $616,200 | $4,800,000 | Not Implemented |