Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 2122 | Metal Ore Mining |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0193 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $946 | $3,500 | Not Implemented |
UU0193 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,875 | $5,000 | Implemented |
UU0193 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,736 | $1,307 | Implemented |
UU0193 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,764 | $4,720 | Implemented |
UU0193 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $371,933 | $40,000 | Implemented |
UU0193 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $269,225 | $7,636,800 | Implemented |
UU0145 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $4,719 | Implemented |
UU0145 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $377,567 | $872,000 | Not Implemented |
UU0145 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $373,488 | $10,000 | Not Implemented |
UU0145 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,566 | $36,000 | Implemented |
UU0145 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $47,010 | $23,850 | Not Implemented |
UU0145 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $25,041 | $5,000 | Not Implemented |
UU0145 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $661 | $440 | Implemented |
OR0423 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $183,000 | $120,860 | Not Implemented |
OR0423 # 06 Y:2002 | 06 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $279,200 | $2,000,000 | Not Implemented |
OR0423 # 05 Y:2002 | 05 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,900 | $0 | Implemented |
OR0423 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,800 | $20,700 | Implemented |
OR0423 # 02 Y:2002 | 02 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $489,000 | $410,000 | n/a |
OR0423 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $518,000 | $300,000 | Not Implemented |
CO0516 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $900 | Implemented |
CO0516 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,370 | $2,480 | Implemented |
CO0516 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,300 | $38,900 | Not Implemented |
CO0516 # 03 Y:2002 | 03 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $44,200 | $30,000 | n/a |
CO0516 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,030 | $21,080 | Implemented |
CO0516 # 01 Y:2002 | 01 | 2002 | INSTALL WIND POWERED ELECTRIC GENERATOR | $616,200 | $4,800,000 | Not Implemented |