IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,275

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0050 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,749 $5,975 Implemented
NL0050 # 03 Y:2020 03 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $328 $2,465 Implemented
NL0050 # 04 Y:2020 04 2020 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $117 $388 Implemented
NL0050 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $58 $280 Implemented
UU0169 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,976 $124,680 Implemented
UU0169 # 02 Y:2020 02 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $24,451 $120,000 Not Implemented
UU0169 # 03 Y:2020 03 2020 USE OPTIMUM TEMPERATURE $4,303 $0 Implemented
UU0169 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $514 $2,100 Implemented
UU0168 # 01 Y:2020 01 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,906 $0 Implemented
UU0168 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,729 $15,550 Implemented
UU0168 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,221 $8,000 Not Implemented
UU0168 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,063 $0 Implemented
UU0168 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $0 Implemented
UU0168 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $178 $0 Implemented
OK1027 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,403 $206,750 Not Implemented
OK1027 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,303 $6,900 Not Implemented
OK1027 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,207 $7,407 Not Implemented
OK1027 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,521 $4,542 Implemented
OK1027 # 05 Y:2020 05 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,801 $12,552 Not Implemented
TT0240 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $78,503 $20 Not Implemented
TT0240 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $199,826 $110,000 Not Implemented
TT0240 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,129 $10,004 Not Implemented
WM0158 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $17,247 $206,684 Not Implemented
WM0158 # 02 Y:2020 02 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $12,529 $45,928 Not Implemented
WM0158 # 03 Y:2020 03 2020 UPGRADE OBSOLETE EQUIPMENT $7,721 $41,700 Not Implemented