IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0760 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,420 $4,344 Implemented
OR0760 # 03 Y:2023 03 2023 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $112,516 $735,625 Implemented
OR0760 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $3,852 $0 Implemented
OR0740 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $54,988 $79,709 Implemented
OR0740 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,547 $3,289 Implemented
OR0740 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $14,480 $12,929 Implemented
OR0740 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,831 $84,560 Implemented
OR0740 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,964 $60,439 Implemented
OR0740 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $69,219 $8,189 Implemented
OR0707 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,884 $53,702 Implemented
OR0707 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $7,954 $8,965 Implemented
OR0707 # 04 Y:2018 04 2018 REDUCE FLUID FLOW RATES $6,509 $7,384 Implemented
OR0707 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,481 $19,583 Implemented
OR0707 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $1,431 $5,365 Implemented
OR0705 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,817,773 $8,000,000 Implemented
OR0695 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,279 $43,386 Implemented
OR0648 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,772 $50 Implemented
OR0648 # 01 Y:2015 01 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,127 $9,607 Implemented
OR0553 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,652 $4,300 Implemented
OR0553 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $8,055 $6,600 Implemented
OR0553 # 02 Y:2009 02 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,352 $35,800 Implemented
OR0553 # 01 Y:2009 01 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $30,000 $81,700 Implemented