IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1074 # 01 Y:2024 01 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $9,834 $0 Not Implemented
UD1074 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,521 $7,100,000 Implemented
UD1074 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $32,977 $336,971 Implemented
UD1074 # 02 Y:2024 02 2024 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,621 $12,700 Not Implemented
UD1074 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $8,430 Implemented
UD1073 # 01 Y:2024 01 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $311 $204 Implemented
UD1073 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,782 $120,000 Implemented
UD1073 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $26,833 $247,333 Not Implemented
UD1043 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,705 $30,000 Not Implemented
UD1043 # 05 Y:2022 05 2022 USE HEAT PUMP FOR SPACE CONDITIONING $18,707 $62,108 Not Implemented
UD1043 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,844 $0 Not Implemented
UD1043 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $540 $0 Not Implemented
UD1043 # 04 Y:2022 04 2022 ELIMINATE/REDUCE AN OPERATION $213 $0 Not Implemented
UD1004 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,429 $0 Not Implemented
UD1004 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,197 $0 Not Implemented
UD1004 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,185 $0 Not Implemented
UD1004 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $0 Not Implemented
UD1004 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $0 Not Implemented
UD0991 # 04 Y:2019 04 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,066 $0 Not Implemented
UD0991 # 03 Y:2019 03 2019 MINIMIZE WATER USAGE $10,365 $0 Not Implemented
UD0991 # 02 Y:2019 02 2019 USE POWER DURING OFF-PEAK PERIODS $15,085 $0 Implemented
UD0991 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,716 $0 Not Implemented
WV0572 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,442 $38,062 Not Implemented
WV0572 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,987 $1,000 Implemented
WV0572 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,232 $5,400 Not Implemented