Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,253
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0123 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $22,871 | $23,400 | Implemented |
UU0123 # 02 Y:2017 | 02 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,624 | $13,970 | Implemented |
UU0123 # 03 Y:2017 | 03 | 2017 | METER WASTE WATER | $4,100 | $0 | Not Implemented |
UU0123 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,374 | $5,770 | Implemented |
UU0123 # 05 Y:2017 | 05 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,114 | $4,625 | Implemented |
MI0322 # 01 Y:2017 | 01 | 2017 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,663,200 | $4,120,000 | Implemented |
MI0322 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $314,391 | $1,004,370 | Implemented |
MI0322 # 03 Y:2017 | 03 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $171,697 | $338,000 | Implemented |
MI0322 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,930 | $6,000 | Not Implemented |
MI0322 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,753 | $112,000 | Not Implemented |
MI0322 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,288 | $72,396 | Implemented |
WM0111 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $135,557 | $350,000 | Not Implemented |
WM0111 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,256 | $90,000 | Not Implemented |
WM0111 # 03 Y:2017 | 03 | 2017 | USE SYNTHETIC LUBRICANT | $30,600 | $7,500 | Not Implemented |
WM0111 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,084 | $45,000 | Not Implemented |
WM0111 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,424 | $56,250 | Not Implemented |
WM0111 # 06 Y:2017 | 06 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,506 | $73,860 | Not Implemented |
IP0089 # 01 Y:2017 | 01 | 2017 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $21,884 | $224 | Implemented |
IP0089 # 02 Y:2017 | 02 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,005 | $186 | Not Implemented |
IP0089 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,654 | $396 | Implemented |
IP0089 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $989 | $190 | Not Implemented |
IP0089 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $1,298 | $1,953 | Implemented |
IP0089 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $332 | $529 | Not Implemented |
IP0089 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,789 | $11,754 | Implemented |
IP0089 # 08 Y:2017 | 08 | 2017 | USE EXISTING DAM TO GENERATE ELECTRICITY | $1,432 | $3,507 | Not Implemented |