Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0254 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,358 | $5,447 | n/a |
UU0254 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,472 | $2,250 | n/a |
UU0254 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $509,495 | $6,000,000 | n/a |
UU0254 # 02 Y:2024 | 02 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,712 | $81,738 | n/a |
UU0254 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,182 | $5,868 | n/a |
UU0254 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $264 | $504 | n/a |
UU0203 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,358 | $60,000 | Not Implemented |
UU0203 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,080 | $10,070 | Not Implemented |
UU0203 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $33,490 | $103,200 | Not Implemented |
UU0200 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,992 | $10,000 | Not Implemented |
UU0200 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,392 | $5,232 | Implemented |
UU0200 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $41,228 | $52,800 | Not Implemented |
UU0197 # 07 Y:2022 | 07 | 2022 | USE OPTIMUM TEMPERATURE | $380 | $200 | Not Implemented |
UU0197 # 06 Y:2022 | 06 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $130 | $25 | Implemented |
UU0197 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,591 | $6,000 | Not Implemented |
UU0197 # 04 Y:2022 | 04 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,230 | $4,000 | Implemented |
UU0197 # 03 Y:2022 | 03 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,900 | $3,000 | Implemented |
UU0197 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $13,098 | $10,000 | Implemented |
UU0197 # 02 Y:2022 | 02 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $12,033 | $300 | Implemented |
UU0183 # 06 Y:2021 | 06 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $15,681 | $1,607 | Implemented |
UU0183 # 05 Y:2021 | 05 | 2021 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $19,111 | $20,527 | Implemented |
UU0183 # 02 Y:2021 | 02 | 2021 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $118,667 | $7,000 | Not Implemented |
UU0183 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,906 | $22,506 | Implemented |
UU0183 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $100,049 | $157,500 | Not Implemented |
UU0183 # 04 Y:2021 | 04 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,893 | $14,200 | Not Implemented |