Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0633 # 09 Y:2022 | 09 | 2022 | INSULATE BARE EQUIPMENT | $447 | $1,572 | Implemented |
WV0633 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,775 | $16,600 | Not Implemented |
WV0633 # 01 Y:2022 | 01 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $14,598 | $23,000 | Not Implemented |
WV0633 # 03 Y:2022 | 03 | 2022 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $4,724 | $12,236 | Not Implemented |
WV0633 # 04 Y:2022 | 04 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,626 | $4,080 | Not Implemented |
WV0633 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $246 | $878 | Implemented |
WV0633 # 06 Y:2022 | 06 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $1,637 | $5,130 | Not Implemented |
WV0633 # 07 Y:2022 | 07 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,011 | $1,500 | Implemented |
WV0633 # 08 Y:2022 | 08 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $640 | $1,280 | Implemented |
WV0633 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,533 | $1,543 | Implemented |
WV0631 # 06 Y:2022 | 06 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $560 | $1,500 | Implemented |
WV0631 # 05 Y:2022 | 05 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $1,092 | $1,292 | Implemented |
WV0631 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,204 | $1,911 | Not Implemented |
WV0631 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,513 | $4,998 | Implemented |
WV0631 # 02 Y:2022 | 02 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $22,924 | $32,450 | Not Implemented |
WV0631 # 01 Y:2022 | 01 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $30,923 | $89,840 | Not Implemented |
WV0588 # 05 Y:2020 | 05 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $691 | $651 | Implemented |
WV0588 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,724 | $0 | Implemented |
WV0588 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,027 | $10,000 | Not Implemented |
WV0588 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,425 | $9,350 | Not Implemented |
WV0588 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,179 | $22,995 | Implemented |
WV0568 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,605 | $52,080 | Not Implemented |
WV0568 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $73,200 | $3,000 | Not Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
WV0568 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,286 | $3,400 | Implemented |