Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 22131 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0698 # 02 Y:2012 | 02 | 2012 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,226 | $6,500 | Not Implemented |
MA0698 # 03 Y:2012 | 03 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,992 | $28,000 | Not Implemented |
MA0698 # 04 Y:2012 | 04 | 2012 | REDESIGN PROCESS | $7,448 | $22,500 | Not Implemented |
MA0698 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,082 | $4,410 | Not Implemented |
MA0698 # 06 Y:2012 | 06 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,103 | $5,900 | Not Implemented |
MA0698 # 07 Y:2012 | 07 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,076 | $9,870 | Not Implemented |
MA0698 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,300 | $1,000 | Not Implemented |
SD0452 # 03 Y:2012 | 03 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,072 | $18,680 | Not Implemented |
SD0452 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,957 | $15,925 | Implemented |
SD0452 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $48,619 | $2,000 | Implemented |
SD0451 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $134,300 | $455,000 | Not Implemented |
SD0451 # 04 Y:2012 | 04 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,240 | $9,000 | Not Implemented |
SD0451 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,577 | $2,373 | Implemented |
SD0451 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,815 | $17,500 | Not Implemented |
SD0451 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $35,395 | $14,332 | Implemented |
SD0452 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,223 | $4,200 | Implemented |
SD0452 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,098 | $275,000 | Implemented |
SD0448 # 03 Y:2012 | 03 | 2012 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $122,834 | $75,600 | Implemented |
SD0448 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,602 | $11,102 | Implemented |
SD0448 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $92,055 | $415,000 | Implemented |
SD0448 # 02 Y:2012 | 02 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $10,195 | $3,320 | Implemented |
SD0448 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,239 | $100 | Not Implemented |
SD0445 # 05 Y:2012 | 05 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,844 | $39,150 | Implemented |
SD0445 # 04 Y:2012 | 04 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $351,013 | $1,040,000 | Implemented |
SD0445 # 02 Y:2012 | 02 | 2012 | REDESIGN PROCESS | $30,890 | $14,775 | Not Implemented |