IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0254 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $5,868 n/a
UU0254 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $264 $504 n/a
UU0254 # 04 Y:2024 04 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,472 $2,250 n/a
UU0254 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $509,495 $6,000,000 n/a
UU0254 # 02 Y:2024 02 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,712 $81,738 n/a
UU0254 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,358 $5,447 n/a
UU0203 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,080 $10,070 Not Implemented
UU0203 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,358 $60,000 Not Implemented
UU0203 # 01 Y:2022 01 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,490 $103,200 Not Implemented
UU0200 # 01 Y:2022 01 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $41,228 $52,800 Not Implemented
UU0200 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,992 $10,000 Not Implemented
UU0200 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,392 $5,232 Implemented
UU0197 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,900 $3,000 Implemented
UU0197 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $13,098 $10,000 Implemented
UU0197 # 02 Y:2022 02 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $12,033 $300 Implemented
UU0197 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,230 $4,000 Implemented
UU0197 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $1,591 $6,000 Not Implemented
UU0197 # 06 Y:2022 06 2022 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $130 $25 Implemented
UU0197 # 07 Y:2022 07 2022 USE OPTIMUM TEMPERATURE $380 $200 Not Implemented
UU0183 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,893 $14,200 Not Implemented
UU0183 # 01 Y:2021 01 2021 SELL COMBUSTIBLE WASTE $149,294 $144,000 Implemented
UU0183 # 02 Y:2021 02 2021 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $118,667 $7,000 Not Implemented
UU0183 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,049 $157,500 Not Implemented
UU0183 # 05 Y:2021 05 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $19,111 $20,527 Implemented
UU0183 # 08 Y:2021 08 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $794 $1,175 Not Implemented