IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0698 # 02 Y:2012 02 2012 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,226 $6,500 Not Implemented
MA0698 # 03 Y:2012 03 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,992 $28,000 Not Implemented
MA0698 # 04 Y:2012 04 2012 REDESIGN PROCESS $7,448 $22,500 Not Implemented
MA0698 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,082 $4,410 Not Implemented
MA0698 # 06 Y:2012 06 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,103 $5,900 Not Implemented
MA0698 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,076 $9,870 Not Implemented
MA0698 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,300 $1,000 Not Implemented
SD0451 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,395 $14,332 Implemented
SD0452 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $102,098 $275,000 Implemented
SD0451 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,815 $17,500 Not Implemented
SD0451 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,577 $2,373 Implemented
SD0451 # 04 Y:2012 04 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,240 $9,000 Not Implemented
SD0451 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $134,300 $455,000 Not Implemented
SD0452 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $48,619 $2,000 Implemented
SD0452 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,957 $15,925 Implemented
SD0452 # 03 Y:2012 03 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,072 $18,680 Not Implemented
SD0452 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,223 $4,200 Implemented
SD0448 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $92,055 $415,000 Implemented
SD0448 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,602 $11,102 Implemented
SD0448 # 03 Y:2012 03 2012 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $122,834 $75,600 Implemented
SD0448 # 02 Y:2012 02 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $10,195 $3,320 Implemented
SD0448 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,239 $100 Not Implemented
SD0445 # 06 Y:2012 06 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $84,757 $300,000 Implemented
SD0445 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,844 $39,150 Implemented
SD0445 # 04 Y:2012 04 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $351,013 $1,040,000 Implemented