IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

798

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0573 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $4,198 Implemented
LE0573 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,318 $5,952 Implemented
LE0573 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $184,074 $995,727 Implemented
LE0573 # 03 Y:2024 03 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $361,764 $1,321,539 Implemented
LE0573 # 02 Y:2024 02 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,341 $20,400 Implemented
UW2411 # 02 Y:2024 02 2024 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $5,536 $0 Implemented
UW2411 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $177 $715 Implemented
UW2411 # 03 Y:2024 03 2024 UPGRADE OBSOLETE EQUIPMENT $2,275 $0 Implemented
SF0618 # 10 Y:2024 10 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $875 $3,607 Implemented
SF0618 # 03 Y:2024 03 2024 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $705,605 $250,000 Implemented
SF0618 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,266 $3,170 Implemented
SF0618 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $175 Implemented
SF0618 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,359 $2,340 Implemented
AS0576 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $188,394 $1,306,404 Implemented
AS0576 # 03 Y:2024 03 2024 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,250 $1,245 Implemented
AS0576 # 07 Y:2024 07 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $562 $2,900 Implemented
AS0576 # 08 Y:2024 08 2024 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $138 $90 Implemented
AS0576 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $1,035 Implemented
AS0576 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $886 $700 Implemented
WM0218 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,959 $3,900 Implemented
WM0218 # 01 Y:2024 01 2024 USE SYNTHETIC LUBRICANT $16,984 $11,275 Implemented
WM0218 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $11,685 $1,659 Implemented
IC0299 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $642 Implemented
IC0299 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,981 $847 Implemented
IC0299 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $23,893 $3,458 Implemented