Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
798
matching recommendationsNAICS | 22132 | Sewage Treatment Facilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0573 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,259 | $4,198 | Implemented |
LE0573 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,318 | $5,952 | Implemented |
LE0573 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $184,074 | $995,727 | Implemented |
LE0573 # 03 Y:2024 | 03 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $361,764 | $1,321,539 | Implemented |
LE0573 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,341 | $20,400 | Implemented |
UW2411 # 02 Y:2024 | 02 | 2024 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $5,536 | $0 | Implemented |
UW2411 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $177 | $715 | Implemented |
UW2411 # 03 Y:2024 | 03 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $2,275 | $0 | Implemented |
SF0618 # 10 Y:2024 | 10 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $875 | $3,607 | Implemented |
SF0618 # 03 Y:2024 | 03 | 2024 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $705,605 | $250,000 | Implemented |
SF0618 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,170 | Implemented |
SF0618 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $175 | Implemented |
SF0618 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,359 | $2,340 | Implemented |
AS0576 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $188,394 | $1,306,404 | Implemented |
AS0576 # 03 Y:2024 | 03 | 2024 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,250 | $1,245 | Implemented |
AS0576 # 07 Y:2024 | 07 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $562 | $2,900 | Implemented |
AS0576 # 08 Y:2024 | 08 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $138 | $90 | Implemented |
AS0576 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $872 | $1,035 | Implemented |
AS0576 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $886 | $700 | Implemented |
WM0218 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,959 | $3,900 | Implemented |
WM0218 # 01 Y:2024 | 01 | 2024 | USE SYNTHETIC LUBRICANT | $16,984 | $11,275 | Implemented |
WM0218 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $11,685 | $1,659 | Implemented |
IC0299 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $642 | Implemented |
IC0299 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,981 | $847 | Implemented |
IC0299 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $23,893 | $3,458 | Implemented |