IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0643 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,439 $12,500 Implemented
OR0543 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $61,542 $40,950 Implemented
OR0543 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $413 Implemented
OR0543 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $19,521 $31,119 Implemented
OR0543 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $10,290 $54,000 Implemented
OR0543 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,310 $148,560 Implemented
OR0543 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Implemented
OR0543 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Implemented
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
DL0029 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,326 $4,000 Implemented
DL0029 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $44,793 $11,000 Implemented
GT0855 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,022 $9,780 Implemented
GT0855 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $1,127 $1,120 Implemented
GT0855 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $795 $500 Implemented
WV0384 # 02 Y:2008 02 2008 DEVELOP A REPAIR/REPLACE POLICY $10,724 $1,094 Implemented
WV0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,609 $6,026 Implemented
WV0384 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $870 $308 Implemented
WV0384 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $438 Implemented
WV0384 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $25 Implemented
SF0364 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,909 $2,854 Implemented
SF0364 # 14 Y:2008 14 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,306 $125,074 Implemented
SF0364 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $409 $801 Implemented