IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0507 # 02 Y:2006 02 2006 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $37,900 $600 Implemented
AM0507 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $13,750 $2,100 Implemented
AM0507 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $9,000 $500 Implemented
AM0507 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $400 Implemented
AM0507 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,900 $9,900 Implemented
AM0507 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $1,620 Implemented
AM0507 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $733 $0 Implemented
AM0507 # 11 Y:2006 11 2006 USE PHOTOCELL CONTROLS $1,120 $100 Implemented
AM0507 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $215 Implemented
MI0125 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $61,073 $1,290 Implemented
MI0125 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,634 $35,000 Implemented
MI0125 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,438 $1,074 Implemented
MI0125 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,589 $850 Implemented
MI0125 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,013 $395 Implemented
MS0290 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,912 $23,061 Implemented
MS0290 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $2,441 $37 Implemented
MS0290 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $239 Implemented
MS0290 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,804 $259 Implemented
MS0290 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,551 $5,861 Implemented
MS0290 # 07 Y:2006 07 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $355 $236 Implemented
IA0384 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,454 $200 Implemented
IA0384 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,970 $1,000 Implemented
IA0384 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $735 Implemented
IA0384 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,056 $1,826 Implemented
IA0384 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $747 $1,000 Implemented