IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0800 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $850 Implemented
CO0567 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,013 $1,156 Implemented
CO0567 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $11,600 Implemented
CO0567 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,350 $4,820 Implemented
CO0567 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $1,810 Implemented
AS0402 # 01 Y:2005 01 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,919 $11,000 Implemented
AS0402 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,755 $1,000 Implemented
AS0402 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $12,630 $1,000 Implemented
AS0402 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,620 $50,533 Implemented
AS0402 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,059 $18,400 Implemented
CO0566 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,560 $300 Implemented
CO0566 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,010 $20,000 Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0483 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $21,624 $0 Implemented
OR0483 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $24,290 $4,400 Implemented
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
LL0227 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,515 $2,800 Implemented
LL0227 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,336 $2,600 Implemented
LL0227 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $150 Implemented
LL0227 # 07 Y:2005 07 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $465 $0 Implemented
LL0227 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,500 $250 Implemented
LL0226 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,228 $1,600 Implemented