IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0096 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,250 $0 Implemented
IC0096 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,209 $4,715 Implemented
IC0096 # 12 Y:2005 12 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,971 $34,362 Implemented
NC0312 # 02 Y:2005 02 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,366 $1,300 Implemented
NC0312 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,325 $2,286 Implemented
NC0312 # 05 Y:2005 05 2005 REDUCE EXCESSIVE BOILER BLOWDOWN $152 $0 Implemented
NC0312 # 06 Y:2005 06 2005 DEVELOP A REPAIR/REPLACE POLICY $125 $273 Implemented
NC0312 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $169 $321 Implemented
NC0312 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100 $100 Implemented
NC0312 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $134 $100 Implemented
MI0099 # 01 Y:2005 01 2005 REPLACE BOILER $31,718 $82,200 Implemented
MI0099 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $11,973 $2,750 Implemented
MI0099 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,897 $470 Implemented
MI0099 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,355 $1,750 Implemented
MI0099 # 07 Y:2005 07 2005 USE MINIMUM STEAM OPERATING PRESSURE $200 $115 Implemented
AM0482 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $50,000 $2,000 Implemented
AM0482 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,940 $500 Implemented
AM0482 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,210 $0 Implemented
AM0482 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,020 $0 Implemented
AM0482 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $0 Implemented
AM0482 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $605 $350 Implemented
AS0394 # 05 Y:2005 05 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $443,040 $453,047 Implemented
LL0218 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,480 $11,450 Implemented
LL0218 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,239 $2,920 Implemented
LL0218 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $2,331 $300 Implemented