IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0486 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $0 Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented
SF0486 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,334 $11,830 Implemented
SF0486 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $15,444 $46,053 Implemented
BS0074 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $249 $117 Implemented
BS0074 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $283 $448 Implemented
BS0074 # 03 Y:2016 03 2016 REPLACE BOILER $2,331 $14,391 Implemented
BS0074 # 04 Y:2016 04 2016 REPAIR OR REPLACE STEAM TRAPS $2,326 $5,073 Implemented
BS0074 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $7 Implemented
BS0074 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $177 $483 Implemented
MZ0216 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,373 $12,000 Implemented
MZ0216 # 03 Y:2016 03 2016 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $404 $800 Implemented
MZ0216 # 05 Y:2016 05 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $2,001 $2,000 Implemented
SF0481 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,477 $140 Implemented
SF0481 # 02 Y:2016 02 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,662 $0 Implemented
SF0481 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,033 $0 Implemented
SF0481 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $105 Implemented
SF0481 # 09 Y:2016 09 2016 UPGRADE CONTROLS ON COMPRESSORS $48,481 $18,682 Implemented
SF0481 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $660 $769 Implemented
MZ0215 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,397 $8,400 Implemented
MZ0215 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $2,514 $1,500 Implemented
MZ0215 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,093 $220 Implemented
AM0709 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $13,090 Implemented
AM0709 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $2,314 $0 Implemented
AM0709 # 01 Y:2016 01 2016 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,770 $1,520 Implemented