IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0549 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $329 $1,151 Implemented
UD0938 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,298 $0 Implemented
UD0938 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
UD0938 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $152 $530 Implemented
IP0053 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $57,305 $915 Implemented
IP0053 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,294 $160 Implemented
IP0053 # 03 Y:2015 03 2015 APPLY FOR INVESTMENT INCENTIVES $38,029 $5,000 Implemented
IP0053 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,650 $2,685 Implemented
IP0053 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $924 Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0287 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,450 $3,140 Implemented
MI0287 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $397 $709 Implemented
MI0287 # 10 Y:2015 10 2015 USE PHOTOCELL CONTROLS $184 $600 Implemented
OR0661 # 01 Y:2015 01 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $52,251 $18,807 Implemented
OR0661 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $1,989 $170 Implemented
OR0660 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,000 $250,000 Implemented
OR0660 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,310 $8,500 Implemented
OR0660 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,283 $1,500 Implemented
OR0659 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,705 $20,000 Implemented
OR0659 # 02 Y:2015 02 2015 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $26,260 $7,200 Implemented
OR0659 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $6,192 $8,000 Implemented
OR0659 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $1,353 $8,000 Implemented
IP0048 # 02 Y:2015 02 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,379 $5 Implemented
IP0048 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $5 Implemented