IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0070 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $828 $94 Implemented
MZ0185 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,593 $7,228 Implemented
MZ0185 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,296 $9,730 Implemented
MZ0185 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $30,214 $15,000 Implemented
TT0160 # 02 Y:2015 02 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,461 $298 Implemented
TT0160 # 04 Y:2015 04 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $10,534 $21,195 Implemented
MA0747 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,522 $25,975 Implemented
MA0747 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,793 $25,975 Implemented
MA0747 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,525 $4,235 Implemented
IA0532 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,363 $44,410 Implemented
IA0532 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,883 $2,175 Implemented
IA0532 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,935 $9,474 Implemented
IA0532 # 05 Y:2015 05 2015 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,465 $210 Implemented
IA0532 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $35 Implemented
IA0532 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $664 $1,752 Implemented
BD0464 # 02 Y:2015 02 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,746 $20,000 Implemented
BD0464 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $6,685 $3,075 Implemented
BD0464 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,364 $2,900 Implemented
BD0464 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,313 $750 Implemented
BD0464 # 09 Y:2015 09 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $590 $40 Implemented
CO0707 # 01 Y:2015 01 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,850 $10,470 Implemented
CO0707 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,740 $480 Implemented
CO0707 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $2,370 Implemented
CO0707 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,840 $1,420 Implemented
CO0707 # 05 Y:2015 05 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,630 $500 Implemented