IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0300 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $129 Implemented
IC0300 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $1,100 Implemented
IC0300 # 06 Y:2024 06 2024 REPAIR OR REPLACE STEAM TRAPS $4,021 $2,910 Implemented
IC0300 # 03 Y:2024 03 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,349 $0 Implemented
IC0300 # 11 Y:2024 11 2024 REPAIR AND ELIMINATE STEAM LEAKS $6,508 $474 Implemented
IC0300 # 13 Y:2024 13 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,410 $0 Implemented
IC0300 # 15 Y:2024 15 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $481 $1,052 Implemented
IC0300 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,041 $3,140 Implemented
IC0300 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $765 $658 Implemented
IC0300 # 12 Y:2024 12 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $188 $0 Implemented
IC0302 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,385 $1,118 Implemented
IC0302 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $1,256 Implemented
IC0302 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,001 $2,566 Implemented
IC0302 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $411 $0 Implemented
IC0302 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,025 $350 Implemented
IC0294 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,597 $3,641 Implemented
IC0294 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $979 $608 Implemented
IC0294 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,276 $1,797 Implemented
IC0261 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $22,735 Implemented
IC0261 # 05 Y:2022 05 2022 METER WASTE WATER $695 $600 Implemented
IC0261 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $2,477 $1,392 Implemented
IC0261 # 02 Y:2022 02 2022 REPAIR AND ELIMINATE STEAM LEAKS $4,207 $360 Implemented
IC0261 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $789 Implemented
IC0247 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $1,539 Implemented
IC0247 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,646 $64,258 Implemented