Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0610 # 12 Y:2021 | 12 | 2021 | INSULATE BARE EQUIPMENT | $409 | $488 | Implemented |
WV0610 # 06 Y:2021 | 06 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,869 | $3,900 | Implemented |
WV0610 # 04 Y:2021 | 04 | 2021 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,861 | $600 | Implemented |
WV0610 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,437 | $2,340 | Implemented |
WV0610 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,994 | $14,525 | Implemented |
WV0610 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,654 | $100 | Implemented |
WV0610 # 11 Y:2021 | 11 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $2,566 | $733 | Implemented |
WV0610 # 09 Y:2021 | 09 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,674 | $1,700 | Implemented |
WV0462 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $57,184 | $0 | Implemented |
WV0462 # 06 Y:2013 | 06 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $42,971 | $6,850 | Implemented |
WV0462 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,390 | $7,119 | Implemented |
WV0462 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,992 | $29,385 | Implemented |
WV0462 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,970 | $1,530 | Implemented |
WV0462 # 10 Y:2013 | 10 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $7,809 | $8,200 | Implemented |
WV0462 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,934 | $15,779 | Implemented |
WV0446 # 04 Y:2012 | 04 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $16,273 | $1,000 | Implemented |
WV0446 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,963 | $2,500 | Implemented |
WV0446 # 09 Y:2012 | 09 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $6,712 | $5,683 | Implemented |
WV0446 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $3,610 | $4,438 | Implemented |
WV0446 # 12 Y:2012 | 12 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,862 | $1,070 | Implemented |
WV0446 # 15 Y:2012 | 15 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,151 | $70 | Implemented |
WV0446 # 17 Y:2012 | 17 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $475 | Implemented |
DL0066 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $4,000 | Implemented |
DL0066 # 03 Y:2011 | 03 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,460 | $2,000 | Implemented |
DL0066 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,035 | Implemented |