IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0610 # 12 Y:2021 12 2021 INSULATE BARE EQUIPMENT $409 $488 Implemented
WV0610 # 06 Y:2021 06 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,869 $3,900 Implemented
WV0610 # 04 Y:2021 04 2021 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,861 $600 Implemented
WV0610 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,437 $2,340 Implemented
WV0610 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,994 $14,525 Implemented
WV0610 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,654 $100 Implemented
WV0610 # 11 Y:2021 11 2021 DEVELOP A REPAIR/REPLACE POLICY $2,566 $733 Implemented
WV0610 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,674 $1,700 Implemented
WV0462 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $57,184 $0 Implemented
WV0462 # 06 Y:2013 06 2013 REPAIR OR REPLACE STEAM TRAPS $42,971 $6,850 Implemented
WV0462 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,390 $7,119 Implemented
WV0462 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $25,992 $29,385 Implemented
WV0462 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,970 $1,530 Implemented
WV0462 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $7,809 $8,200 Implemented
WV0462 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,934 $15,779 Implemented
WV0446 # 04 Y:2012 04 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $16,273 $1,000 Implemented
WV0446 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,963 $2,500 Implemented
WV0446 # 09 Y:2012 09 2012 DEVELOP A REPAIR/REPLACE POLICY $6,712 $5,683 Implemented
WV0446 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $3,610 $4,438 Implemented
WV0446 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $1,070 Implemented
WV0446 # 15 Y:2012 15 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,151 $70 Implemented
WV0446 # 17 Y:2012 17 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $475 Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented