Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
248
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0938 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,415 | $0 | Implemented |
UD0938 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $152 | $530 | Implemented |
IP0053 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $924 | Implemented |
IP0053 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,650 | $2,685 | Implemented |
IP0053 # 03 Y:2015 | 03 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $38,029 | $5,000 | Implemented |
IP0053 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,294 | $160 | Implemented |
IP0053 # 01 Y:2015 | 01 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $57,305 | $915 | Implemented |
UD0938 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,298 | $0 | Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |
OR0661 # 01 Y:2015 | 01 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $52,251 | $18,807 | Implemented |
OR0661 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $1,989 | $170 | Implemented |
OR0660 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,000 | $250,000 | Implemented |
OR0660 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $1,500 | Implemented |
OR0660 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $3,310 | $8,500 | Implemented |
OR0659 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $1,353 | $8,000 | Implemented |
OR0659 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,705 | $20,000 | Implemented |
OR0659 # 04 Y:2015 | 04 | 2015 | INSULATE BARE EQUIPMENT | $6,192 | $8,000 | Implemented |
OR0659 # 02 Y:2015 | 02 | 2015 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $26,260 | $7,200 | Implemented |
IP0048 # 04 Y:2015 | 04 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $902 | $45 | Implemented |
IP0048 # 02 Y:2015 | 02 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,379 | $5 | Implemented |
IP0048 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,718 | $5 | Implemented |