IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0190 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $1,000 Not Implemented
TT0190 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $88 $200 Implemented
MI0309 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $16,370 $1,640 Implemented
MI0309 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,394 $34,000 Implemented
MI0309 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,478 $320 Implemented
MI0309 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $4,544 $1,640 Implemented
MI0309 # 05 Y:2017 05 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,389 $1,729 Implemented
MI0309 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,090 $1,882 Implemented
MI0309 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $6,223 Implemented
MI0309 # 08 Y:2017 08 2017 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $649 $210 Implemented
MI0309 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $307 $1,591 Implemented
LS0002 # 01 Y:2017 01 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,531 $0 Not Implemented
LS0002 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,634 $0 Not Implemented
LS0002 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $1,124 $0 Not Implemented
LS0002 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $16,140 $0 Not Implemented
LS0002 # 05 Y:2017 05 2017 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $271,330 $0 Not Implemented
LS0002 # 06 Y:2017 06 2017 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,736 $0 Not Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented
SF0501 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,047 $0 Not Implemented
SF0501 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $84 Not Implemented
SF0501 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,074 $1,769 Implemented
SF0501 # 05 Y:2017 05 2017 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,356 $1,821 Not Implemented
SF0501 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $147,360 $665,154 Not Implemented
UA0179 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $53,482 $100,000 Not Implemented
UA0179 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $44,167 $500 Not Implemented