IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0274 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,100 $639 Implemented
MI0274 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,582 $6,871 Implemented
MI0274 # 10 Y:2015 10 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,145 $780 Implemented
MI0274 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $626 $360 Implemented
MI0274 # 12 Y:2015 12 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $160 Implemented
MI0274 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $320 $310 Not Implemented
MI0274 # 14 Y:2015 14 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $253 $320 Implemented
WV0498 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,712 $100,740 Not Implemented
WV0498 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $45,555 $130,520 Not Implemented
WV0498 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,058 $1,700 Implemented
WV0498 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,550 $1,000 Implemented
WV0498 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,891 $599 Implemented
WV0498 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $6,111 $6,377 Implemented
WV0498 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $5,821 $864 Implemented
WV0498 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $19,874 Implemented
WV0498 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,537 $0 Not Implemented
WV0498 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $170 $457 Not Implemented
SF0459 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $29,918 $5,047 Implemented
SF0459 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $0 Implemented
SF0459 # 03 Y:2015 03 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $196,316 $40,788 Not Implemented
SF0459 # 04 Y:2015 04 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $41,206 $19,989 Not Implemented
SF0459 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,624 $15,013 Not Implemented
SF0459 # 06 Y:2015 06 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,360 $14,429 Implemented
SF0459 # 07 Y:2015 07 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,292 $1,945 Implemented
SF0459 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,977 $11,607 Not Implemented