IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 Not Implemented
OR0768 # 02 Y:2023 02 2023 USE AUTOMATIC FLOW CONTROL $24,867 $9,600 Not Implemented
OR0768 # 01 Y:2023 01 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,535 $8,125 Implemented
OR0768 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,178 $5,693 Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
OR0749 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,003 $11,329 Implemented
OR0749 # 04 Y:2022 04 2022 REPLACE BOILER $122,100 $1,640,000 Implemented
OR0749 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $999 $0 Implemented
OR0749 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $43,522 $28,094 Not Implemented
OR0744 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $15,238 $36,792 Implemented
OR0744 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,065 $18,105 Implemented
OR0744 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $2,348 $0 Implemented
OR0744 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,963 $2,340 Implemented
OR0744 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,766 $8,671 Not Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented
OR0742 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,662 $6,857 Not Implemented
OR0742 # 02 Y:2021 02 2021 REDESIGN PROCESS $3,895 $0 Implemented
OR0742 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,200 $38,018 Not Implemented
OR0735 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $5,347 $1,090 Implemented
OR0735 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $3,031 $0 Implemented
OR0735 # 02 Y:2020 02 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,510 $2,925 Not Implemented
OR0710 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,410 $3,742 Not Implemented