Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
331
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0773 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,507 | $13,124 | Not Implemented |
OR0768 # 02 Y:2023 | 02 | 2023 | USE AUTOMATIC FLOW CONTROL | $24,867 | $9,600 | Not Implemented |
OR0768 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,535 | $8,125 | Implemented |
OR0768 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,178 | $5,693 | Implemented |
OR0757 # 03 Y:2022 | 03 | 2022 | INSTALL AUTOMATIC PACKING EQUIPMENT | $97,200 | $50,000 | Not Implemented |
OR0757 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,612 | $0 | Not Implemented |
OR0757 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $26,900 | $0 | Not Implemented |
OR0757 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $194,400 | $300,000 | Not Implemented |
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
OR0749 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $999 | $0 | Implemented |
OR0749 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $43,522 | $28,094 | Not Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,766 | $8,671 | Not Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0742 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,662 | $6,857 | Not Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 04 Y:2021 | 04 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,200 | $38,018 | Not Implemented |
OR0735 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $5,347 | $1,090 | Implemented |
OR0735 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,031 | $0 | Implemented |
OR0735 # 02 Y:2020 | 02 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,510 | $2,925 | Not Implemented |
OR0710 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,410 | $3,742 | Not Implemented |