IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0669 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $12,439 $25,000 Not Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0664 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $133,570 $55,950 Implemented
MA0664 # 02 Y:2010 02 2010 MINIMIZE WATER USAGE $26,438 $62,000 Not Implemented
MA0664 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,051 $34,000 Not Implemented
MA0664 # 04 Y:2010 04 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,890 $95,000 Not Implemented
MA0664 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,874 $18,345 Not Implemented
MA0664 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,084 $200 Implemented
MA0654 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,876 $9,840 Not Implemented
MA0654 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,377 $18,330 Implemented
MA0654 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,750 $30,000 Implemented
MA0654 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $22,566 $39,500 Not Implemented
MA0643 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,019 $3,800 Not Implemented
MA0643 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,439 $12,500 Implemented
MA0643 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,728 $18,400 Implemented
MA0643 # 02 Y:2009 02 2009 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $43,089 $6,000 Implemented
MA0643 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $239,800 $170,000 Not Implemented
MA0614 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,376 $20,000 Not Implemented
MA0614 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,978 $5,000 Implemented
MA0614 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,036 $8,400 Implemented
MA0614 # 03 Y:2007 03 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,870 $0 Implemented
MA0614 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,416 $9,000 Not Implemented
MA0614 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $31,477 Implemented
MA0614 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,118 $1,600 Implemented
MA0603 # 02 Y:2006 02 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $54,146 $2,000 Implemented