IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented
BD0286 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40,515 $5,400 Not Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented
BD0286 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,512 $400 Not Implemented
BD0286 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $596 Not Implemented
BD0286 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $350 Implemented
BD0286 # 12 Y:2005 12 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $88,374 $20,512 Not Implemented
BD0286 # 13 Y:2005 13 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,243,590 $504,283 Implemented
LL0225 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,146 $2,000 Implemented
LL0225 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,111 $50 Implemented
LL0225 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,676 $400 Implemented
LL0225 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,991 $0 Not Implemented
LL0225 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,445 $0 Not Implemented
LL0225 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $1,100 $0 Not Implemented
LL0225 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $150 Implemented
LL0225 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $154,500 $2,500 Implemented
MS0274 # 01 Y:2005 01 2005 HEAT WATER WITH EXHAUST HEAT $35,536 $19,550 Not Implemented
MS0274 # 02 Y:2005 02 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,485 $5,832 Not Implemented
MS0274 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,356 $15,064 Not Implemented
MS0274 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,508 $2,000 Not Implemented
MS0274 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $5,356 $94 Not Implemented