IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0647 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,576 $25,575 Implemented
OR0647 # 03 Y:2015 03 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $8,286 $7,123 Not Implemented
OR0647 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,293 $800 Not Implemented
OR0647 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,826 $4,986 Implemented
OR0641 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $581 $1,121 Implemented
OR0641 # 04 Y:2014 04 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,470 $1,577 Implemented
OR0641 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,509 $8,500 Not Implemented
OR0641 # 02 Y:2014 02 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,580 $8,760 Implemented
OR0641 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,076 $2,794 Implemented
OR0632 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $2,833 $0 Not Implemented
OR0632 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $500 Implemented
OR0632 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,285 $0 Not Implemented
OR0632 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,497 $2,837 Implemented
OR0632 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $3,802 $0 Not Implemented
OR0626 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,463 $3,437 Not Implemented
OR0626 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,138 $5,659 Not Implemented
OR0626 # 05 Y:2014 05 2014 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,445 $6,461 Not Implemented
OR0626 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $7,138 $5,500 Not Implemented
OR0626 # 03 Y:2014 03 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $11,422 $7,219 Not Implemented
OR0626 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,945 $1,000 Not Implemented
OR0626 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,202 $6,792 Not Implemented
OR0618 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,187 $2,283 Not Implemented
OR0618 # 04 Y:2013 04 2013 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $9,796 $50,179 Not Implemented
OR0618 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $977 $1,975 Not Implemented
OR0618 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $10,380 $800 Not Implemented