Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
331
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0618 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,187 | $2,283 | Not Implemented |
OR0610 # 01 Y:2013 | 01 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $11,054 | $11,584 | Not Implemented |
OR0610 # 02 Y:2013 | 02 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $8,287 | $11,998 | Not Implemented |
OR0610 # 03 Y:2013 | 03 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $161,127 | $238,200 | Not Implemented |
OR0610 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,406 | $2,100 | Not Implemented |
OR0610 # 05 Y:2013 | 05 | 2013 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $64,511 | $85,275 | Implemented |
OR0610 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $8,077 | $26,477 | Not Implemented |
OR0610 # 07 Y:2013 | 07 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $6,621 | $24,248 | Not Implemented |
OR0610 # 08 Y:2013 | 08 | 2013 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $4,383 | $16,215 | Not Implemented |
OR0610 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,145 | $5,840 | Not Implemented |
OR0609 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,082 | $4,037 | Not Implemented |
OR0609 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $4,347 | $4,299 | Not Implemented |
OR0609 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,555 | $4,200 | Not Implemented |
OR0609 # 04 Y:2013 | 04 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,499 | $5,792 | Not Implemented |
OR0609 # 05 Y:2013 | 05 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,900 | $4,480 | Not Implemented |
OR0609 # 06 Y:2013 | 06 | 2013 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $142,102 | $374,500 | Not Implemented |
OR0609 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $117,782 | $160,770 | Implemented |
OR0609 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,018 | $5,875 | Not Implemented |
OR0609 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $28,299 | $42,000 | Not Implemented |
OR0594 # 01 Y:2012 | 01 | 2012 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $393,360 | $20,880 | Not Implemented |
OR0594 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $163,282 | $119,416 | Not Implemented |
OR0594 # 03 Y:2012 | 03 | 2012 | Install Anaerobic Digester | $1,369,423 | $3,468,069 | Implemented |
OR0594 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,684 | $7,360 | Implemented |
OR0594 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC STACK DAMPER | $3,989 | $5,325 | Not Implemented |
OR0594 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $2,867 | $2,708 | Not Implemented |