Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
238
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0787 # 05 Y:2010 | 05 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $176 | $86 | Implemented |
OK0787 # 06 Y:2010 | 06 | 2010 | REPLACE BOILER | $13,921 | $51,278 | Not Implemented |
OK0787 # 07 Y:2010 | 07 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,451 | $16,000 | Implemented |
OK0787 # 08 Y:2010 | 08 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,321 | $9,900 | Not Implemented |
OK0778 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $171,482 | $47,731 | Implemented |
OK0778 # 02 Y:2009 | 02 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,464 | $1,266 | Implemented |
OK0778 # 03 Y:2009 | 03 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $13,933 | $525 | Implemented |
OK0778 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,111 | $5,417 | Implemented |
OK0778 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $412 | $0 | Implemented |
OK0766 # 01 Y:2008 | 01 | 2008 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,948 | $775 | Implemented |
OK0766 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,063 | $0 | Implemented |
OK0766 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $1,937 | Implemented |
OK0766 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,350 | $11,729 | Not Implemented |
OK0766 # 05 Y:2008 | 05 | 2008 | Install Anaerobic Digester | $304,567 | $240,000 | Not Implemented |
OK0735 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $69,788 | $55,933 | Not Implemented |
OK0735 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,821 | $9,500 | Not Implemented |
OK0735 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,625 | $4,000 | Not Implemented |
OK0735 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,193 | $12,830 | Not Implemented |
OK0735 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,240 | $700 | Not Implemented |
OK0729 # 01 Y:2006 | 01 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,248 | $15,150 | Not Implemented |
OK0729 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,516 | $4,800 | Not Implemented |
OK0729 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,820 | $3,090 | Not Implemented |
OK0729 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,968 | $18,960 | Not Implemented |
OK0729 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,965 | $3,244 | Not Implemented |
OK0713 # 01 Y:2005 | 01 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $81,171 | $1,436 | Implemented |