IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0787 # 05 Y:2010 05 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $176 $86 Implemented
OK0787 # 06 Y:2010 06 2010 REPLACE BOILER $13,921 $51,278 Not Implemented
OK0787 # 07 Y:2010 07 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,451 $16,000 Implemented
OK0787 # 08 Y:2010 08 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,321 $9,900 Not Implemented
OK0778 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $171,482 $47,731 Implemented
OK0778 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,464 $1,266 Implemented
OK0778 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,933 $525 Implemented
OK0778 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,111 $5,417 Implemented
OK0778 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $412 $0 Implemented
OK0766 # 01 Y:2008 01 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,948 $775 Implemented
OK0766 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,063 $0 Implemented
OK0766 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,937 Implemented
OK0766 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,350 $11,729 Not Implemented
OK0766 # 05 Y:2008 05 2008 Install Anaerobic Digester $304,567 $240,000 Not Implemented
OK0735 # 01 Y:2006 01 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $69,788 $55,933 Not Implemented
OK0735 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,821 $9,500 Not Implemented
OK0735 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,625 $4,000 Not Implemented
OK0735 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,193 $12,830 Not Implemented
OK0735 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,240 $700 Not Implemented
OK0729 # 01 Y:2006 01 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,248 $15,150 Not Implemented
OK0729 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,516 $4,800 Not Implemented
OK0729 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,820 $3,090 Not Implemented
OK0729 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $18,960 Not Implemented
OK0729 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $3,244 Not Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented