IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
UW0021 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $52,486 $175,000 Not Implemented
UW0021 # 02 Y:2008 02 2008 OPERATE BOILERS ON HIGH FIRE SETTING $20,223 $49,000 Not Implemented
UW0021 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $5,912 Not Implemented
UW0021 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,612 $50,000 Not Implemented
UW0021 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,472 $0 Not Implemented
UW0021 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $478 $450 Not Implemented
OR0511 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,200,000 $400,000 Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
OR0511 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $7,340 Not Implemented
OR0511 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $14,400 $13,700 Implemented
OR0511 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $0 Implemented
OR0511 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented
OR0511 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,800 $4,500 Not Implemented
OR0511 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $5,000 Implemented
OR0511 # 09 Y:2006 09 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,400 $2,600 Not Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0510 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,000 $11,600 Not Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented
OR0510 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $11,250 $13,600 Not Implemented
OR0510 # 05 Y:2006 05 2006 INSTALL SKYLIGHTS $4,750 $12,400 Not Implemented
OR0510 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $5,000 Not Implemented