IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0012 # 06 Y:2022 06 2022 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $7,230 $30,000 n/a
CC0012 # 05 Y:2022 05 2022 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,233 $0 n/a
CC0012 # 03 Y:2022 03 2022 OPERATE BOILERS ON HIGH FIRE SETTING $4,544 $10,000 n/a
CC0012 # 07 Y:2022 07 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $47,241 $125,000 n/a
CC0012 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,343 $16,000 n/a
CC0012 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,525 $10,000 n/a
CC0012 # 01 Y:2022 01 2022 UPGRADE CONTROLS ON COMPRESSORS $38,944 $0 n/a
CC0006 # 03 Y:2022 03 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $51,588 $175,000 n/a
CC0006 # 02 Y:2022 02 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,077 $60,000 n/a
CC0006 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,027 $5,000 n/a
CC0006 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,461 $10,000 n/a
CC0006 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,854 $13,360 n/a
CC0005 # 07 Y:2022 07 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $36,944 $110,000 n/a
CC0005 # 05 Y:2022 05 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,973 $1,500 n/a
CC0005 # 06 Y:2022 06 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,225 $30,000 n/a
CC0005 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,273 $1,000 n/a
CC0005 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,997 $6,000 n/a
CC0005 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,985 $26,500 n/a
CC0005 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,217 $0 n/a
CL2102 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,049 $0 Implemented
CL2102 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $2,846 Implemented
CL2102 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $322 $453 Not Implemented
CL2102 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $3,180 Implemented
NC0639 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $103,705 $500 Not Implemented
NC0639 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,819 $1,000 Not Implemented