ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0514 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,154 | $30,844 | Implemented |
UF0514 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,847 | $20,000 | Implemented |
UF0514 # 04 Y:2017 | 04 | 2017 | REDUCE EXCESS STEAM BLEEDING | $4,320 | $0 | Implemented |
UF0514 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,693 | $6,775 | Implemented |
UF0514 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,740 | $2,882 | Implemented |
UF0514 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,432 | $0 | Implemented |
UF0514 # 03 Y:2017 | 03 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,710 | $7,580 | Not Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
LS0012 # 01 Y:2017 | 01 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $28,766 | $12,000 | Not Implemented |
LS0012 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,205 | $920 | Not Implemented |
LS0012 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,215 | $80,000 | Not Implemented |
LS0012 # 04 Y:2017 | 04 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,748 | $15,200 | Not Implemented |
LS0012 # 05 Y:2017 | 05 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,685 | $4,250 | Not Implemented |
UF0513 # 08 Y:2017 | 08 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,095 | $5,053 | Implemented |
UF0513 # 05 Y:2017 | 05 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,342 | $27,695 | Implemented |
UF0513 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,848 | $10,386 | Not Implemented |
UF0513 # 07 Y:2017 | 07 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,443 | $1,481 | Implemented |
UF0513 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,487 | $23,157 | Implemented |
LS0012 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $993 | $548 | Not Implemented |
UF0513 # 01 Y:2017 | 01 | 2017 | REPLACE BOILER | $38,664 | $30,000 | Not Implemented |