IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0633 # 01 Y:2023 01 2023 DEVELOP A REPAIR/REPLACE POLICY $1,124 $98 Implemented
SD0633 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,814 $77,773 Implemented
SD0633 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,830 Implemented
SD0633 # 04 Y:2023 04 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $372,017 $505,200 Implemented
SD0633 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,338 $500 Implemented
SD0633 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $219,112 $395,439 Implemented
SD0633 # 07 Y:2023 07 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,972 $66,845 Implemented
SD0633 # 08 Y:2023 08 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $102,944 $0 Implemented
SF0500 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $161 $294 Implemented
SF0500 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,907 $0 Implemented
SF0500 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,814 $7,558 Implemented
LM0120 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $50,309 $1,000 Implemented
LM0120 # 06 Y:2006 06 2006 MODIFY WORKLOAD $47,807 $1,000 Implemented
LM0120 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $4,118 $0 Implemented
LM0120 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,819 $0 Implemented
SF0328 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $346 $273 Implemented
SF0328 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $522 $298 Implemented
SF0328 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $2,821 $783 Implemented
SF0328 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $4,864 $0 Implemented
SF0328 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $0 Implemented
SF0328 # 03 Y:2006 03 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $2,038 $473 Implemented
SF0317 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $679 $0 Implemented
SF0317 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,170 $771 Implemented
SF0317 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $480 Implemented
SF0317 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,370 $50,000 Implemented