IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
NAICS 311230 Breakfast Cereal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0230 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,418 $0 n/a
DL0230 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $100,915 $74,000 n/a
DL0230 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,919 $2,200 n/a
DL0230 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,146 $2,040 n/a
DL0230 # 02 Y:2024 02 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $44,058 $22,437 n/a
DL0230 # 06 Y:2024 06 2024 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,141 $10,000 n/a
DL0230 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $13,779 $15,504 n/a
CI0023 # 09 Y:2023 09 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $13,000 n/a
CI0023 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,797 $5,000 n/a
CI0023 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,670 $7,500 n/a
CI0023 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,881 $2,299 n/a
CI0023 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $7,791 $2,625 n/a
CI0023 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,902 $300 n/a
CI0023 # 03 Y:2023 03 2023 REPLACE BOILER $13,894 $30,000 n/a
CI0023 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $78,738 $658,288 n/a
CI0023 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $45,480 $17,533 n/a
IC0220 # 04 Y:2019 04 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $37,319 $5,747 Not Implemented
IC0220 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75,268 $7,000 Implemented
IC0220 # 06 Y:2019 06 2019 MINIMIZE WATER USAGE $9,210 $11,980 Implemented
IC0220 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $274 $250 Not Implemented
IC0220 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $17,321 $4,875 Implemented
IC0220 # 02 Y:2019 02 2019 MAINTAIN MACHINES TO REDUCE LEAKS $8,888 $5,750 Not Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented