IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 31135 Chocolate and Confectionery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0385 # 03 Y:2010 03 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,195 $1,760 Implemented
SF0385 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $14,856 $6,800 Implemented
SF0385 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,608 $750 Implemented
SF0385 # 09 Y:2010 09 2010 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $640 $633 Implemented
SF0385 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $5,266 $5,951 Implemented
SF0385 # 14 Y:2010 14 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,082 $12,770 Implemented
SF0385 # 16 Y:2010 16 2010 OPTIMIZE PLANT POWER FACTOR $9,677 $23,715 Implemented
SF0385 # 18 Y:2010 18 2010 USE OPTIMUM THICKNESS INSULATION $36,228 $325,369 Implemented
UW0041 # 01 Y:2010 01 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,098 $866 Implemented
UW0041 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $653 $1,306 Implemented
UW0041 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $521 $261 Implemented
SF0382 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $9,146 $2,700 Implemented
SF0382 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,775 $7,837 Implemented
SF0382 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $53,897 $49,178 Implemented
SF0382 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $4,141 $6,637 Implemented
SF0382 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $12,608 $36,493 Implemented
SF0382 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $733 $2,953 Implemented
SF0382 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,423 $62,855 Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
UW0013 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Implemented
OR0520 # 01 Y:2007 01 2007 COMBINE UTILITY METERS $33,600 $32,500 Implemented
OR0520 # 02 Y:2007 02 2007 $15,400 $0 Implemented