Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
698
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS032 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $256 | $400 | Implemented |
SF0423 # 01 Y:2012 | 01 | 2012 | CLOSE OFF UNNEEDED STEAM LINES | $417 | $0 | Implemented |
SF0423 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $4,512 | $0 | Implemented |
SF0423 # 03 Y:2012 | 03 | 2012 | INSTALL SET-BACK TIMERS | $3,656 | $0 | Implemented |
SF0423 # 04 Y:2012 | 04 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,375 | $3,925 | Implemented |
SF0423 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $4,091 | $4,108 | Implemented |
SF0423 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $14,919 | $21,094 | Implemented |
SF0423 # 08 Y:2012 | 08 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $406 | $1,040 | Implemented |
SF0423 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $2,993 | $7,655 | Implemented |
SF0423 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,535 | $127,175 | Implemented |
SF0423 # 12 Y:2012 | 12 | 2012 | RECOVER AND REUSE COOLING WATER | $4,700 | $700 | Implemented |
AM0620 # 06 Y:2012 | 06 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,965 | $240 | Implemented |
AM0620 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,390 | $0 | Implemented |
AM0620 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $3,290 | Implemented |
AM0620 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,030 | $1,650 | Implemented |
UM0411 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $821 | $100 | Implemented |
AM0620 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,900 | $2,000 | Implemented |
AM0620 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,800 | $0 | Implemented |
AM0620 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,660 | $120 | Implemented |
AM0620 # 04 Y:2012 | 04 | 2012 | REPLACE BOILER | $5,730 | $30,000 | Implemented |
MI0227 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $63,004 | $11,425 | Implemented |
MI0227 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,918 | $1,660 | Implemented |
MI0227 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,932 | $19,454 | Implemented |
MI0227 # 05 Y:2012 | 05 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,886 | $142,619 | Implemented |
MI0227 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,306 | $12,160 | Implemented |