IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

698

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0521 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $3,586 $2,800 Implemented
UF0521 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $4,143 Implemented
UF0521 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,195 $15,000 Implemented
UF0521 # 03 Y:2018 03 2018 REPAIR AND ELIMINATE STEAM LEAKS $13,844 $562 Implemented
UF0521 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $41,132 $314,072 Implemented
UF0521 # 01 Y:2018 01 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $45,855 $11,386 Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MI0327 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $12,641 $3,600 Implemented
MI0327 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,990 $7,485 Implemented
MI0327 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,743 $520 Implemented
MI0327 # 07 Y:2018 07 2018 USE UTILITY CONTROLLED POWER MANAGEMENT $2,349 $80 Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented
SF0513 # 03 Y:2018 03 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $66,148 $67,793 Implemented
SF0513 # 02 Y:2018 02 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $177,909 $41,250 Implemented
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
UF0513 # 04 Y:2017 04 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $7,542 $0 Implemented
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
TT0198 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,600 Implemented