IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0694 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $190,250 $7,842 Not Implemented
OR0694 # 02 Y:2017 02 2017 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $78,503 $7,018 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0626 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,202 $6,792 Not Implemented
OR0626 # 05 Y:2014 05 2014 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,445 $6,461 Not Implemented
OR0626 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $7,138 $5,500 Not Implemented
OR0626 # 03 Y:2014 03 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $11,422 $7,219 Not Implemented
OR0626 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,945 $1,000 Not Implemented
OR0626 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,138 $5,659 Not Implemented
OR0626 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,463 $3,437 Not Implemented
OR0610 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,406 $2,100 Not Implemented
OR0610 # 05 Y:2013 05 2013 MODERATE COOLING TOWER OUTLET TEMPERATURE $64,511 $85,275 Implemented
OR0610 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $11,054 $11,584 Not Implemented
OR0610 # 02 Y:2013 02 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $8,287 $11,998 Not Implemented
OR0610 # 03 Y:2013 03 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $161,127 $238,200 Not Implemented
OR0610 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $8,077 $26,477 Not Implemented
OR0610 # 07 Y:2013 07 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,621 $24,248 Not Implemented
OR0610 # 08 Y:2013 08 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,383 $16,215 Not Implemented
OR0610 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,145 $5,840 Not Implemented
OR0609 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $117,782 $160,770 Implemented