Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2408 # 03 Y:2024 | 03 | 2024 | REPLACE BOILER | $57,645 | $247,500 | n/a |
LS2408 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,002 | $144,549 | n/a |
LS2408 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $135 | n/a |
LT8369 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,592 | $12,831 | n/a |
LT8369 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $4,568 | $3,852 | n/a |
LT8369 # 01 Y:2022 | 01 | 2022 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,717 | $30,030 | n/a |
LS1915 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $310 | $33 | Not Implemented |
LS1915 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $99 | $25 | Not Implemented |
LS1915 # 03 Y:2019 | 03 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $607 | $450 | Not Implemented |
LS1915 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,228 | $1,974 | Implemented |
LS1915 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,568 | $12,000 | Not Implemented |
LS1915 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $109 | $258 | Not Implemented |
LL0322 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $30 | Implemented |
LL0322 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,523 | $910 | Not Implemented |
LL0322 # 04 Y:2009 | 04 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $967 | $120 | Not Implemented |
LL0322 # 05 Y:2009 | 05 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $676 | $1,155 | Not Implemented |
LL0322 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $460 | $120 | Implemented |
LL0322 # 07 Y:2009 | 07 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $417 | $467 | Not Implemented |
LL0322 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,918 | $4,600 | Implemented |