Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsNAICS | 31141 | Frozen Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0591 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,521 | $18,051 | Implemented |
SF0591 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,540 | $14,724 | Implemented |
SF0591 # 04 Y:2022 | 04 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,698 | $0 | Implemented |
SF0591 # 06 Y:2022 | 06 | 2022 | INSTALL SET-BACK TIMERS | $22,648 | $6,467 | Implemented |
SF0591 # 03 Y:2022 | 03 | 2022 | REDUCE EXCESS STEAM BLEEDING | $9,616 | $0 | Implemented |
SF0591 # 02 Y:2022 | 02 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $9,922 | $0 | Implemented |
SF0554 # 10 Y:2020 | 10 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,351 | $5,888 | Implemented |
SF0554 # 09 Y:2020 | 09 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $632 | $1,312 | Implemented |
SF0554 # 07 Y:2020 | 07 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $871 | $1,184 | Implemented |
SF0554 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $80 | Implemented |
SF0554 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,099 | $13,511 | Implemented |
SF0513 # 02 Y:2018 | 02 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $177,909 | $41,250 | Implemented |
SF0513 # 03 Y:2018 | 03 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $66,148 | $67,793 | Implemented |
SF0513 # 05 Y:2018 | 05 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $64,975 | $191,474 | Implemented |
SF0399 # 12 Y:2011 | 12 | 2011 | INSTALL OCCUPANCY SENSORS | $5,862 | $26,604 | Implemented |
SF0399 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,758 | $307,524 | Implemented |
SF0399 # 04 Y:2011 | 04 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $347 | $393 | Implemented |
SF0399 # 03 Y:2011 | 03 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,432 | $962 | Implemented |
SF0399 # 01 Y:2011 | 01 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $14,389 | $0 | Implemented |
SF0374 # 09 Y:2009 | 09 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $51,835 | $40,007 | Implemented |
SF0374 # 10 Y:2009 | 10 | 2009 | USE PHOTOCELL CONTROLS | $18,403 | $18,196 | Implemented |
SF0374 # 11 Y:2009 | 11 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,553 | $5,659 | Implemented |
SF0374 # 18 Y:2009 | 18 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,622 | $86,476 | Implemented |
SF0374 # 16 Y:2009 | 16 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,002 | $318 | Implemented |
SF0374 # 17 Y:2009 | 17 | 2009 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $89,029 | $326,072 | Implemented |