IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0356 # 01 Y:2019 01 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $68,283 $118,050 Not Implemented
MI0356 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,750 $42,002 Implemented
MI0356 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,615 $19,558 Implemented
MI0356 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,171 $24,418 Not Implemented
MI0356 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $10,928 $8,500 Implemented
MI0356 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,814 $480 Implemented
MI0356 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,181 $2,320 Not Implemented
MI0356 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,569 $2,020 Implemented
MI0356 # 09 Y:2019 09 2019 USE SOLAR HEAT TO HEAT WATER $7,502 $13,650 Not Implemented
MI0356 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $7,059 $11,855 Not Implemented
OK1004 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,732 $6,990 Not Implemented
OK1004 # 02 Y:2019 02 2019 IMPROVE COMBUSTION CONTROL CAPABILITY $5,516 $18,500 Not Implemented
OK1004 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $255 $1,132 Not Implemented
OK1004 # 04 Y:2019 04 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $679 $1,295 Not Implemented
OK1004 # 05 Y:2019 05 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,751 $8,520 Not Implemented
BS0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $20 Not Implemented
BS0118 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $616 $960 Not Implemented
BS0118 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $30 Not Implemented
BS0118 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,313 $760 Not Implemented
BS0118 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $275 Not Implemented
BS0118 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $210 Not Implemented
BS0118 # 07 Y:2019 07 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,186 $790 Not Implemented
SU0471 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $529 $179 Not Implemented
SU0471 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,625 Implemented
SU0471 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $955 $1,560 Not Implemented