Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
920
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0264 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,405 | $8,915 | n/a |
UU0264 # 11 Y:2025 | 11 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,506 | $432,000 | n/a |
UU0264 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $538 | $1,531 | n/a |
UU0264 # 03 Y:2025 | 03 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $729,671 | $3,645,455 | n/a |
UU0264 # 01 Y:2025 | 01 | 2025 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $79,422 | $143,652 | n/a |
UU0264 # 02 Y:2025 | 02 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $215,672 | $730,950 | n/a |
UU0264 # 10 Y:2025 | 10 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $916 | n/a |
UU0264 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,905 | $7,317 | n/a |
UU0264 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,332 | $4,000 | n/a |
UU0264 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $379,077 | $4,080,441 | n/a |
UU0264 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,517 | $717,537 | n/a |
OR0802 # 04 Y:2024 | 04 | 2024 | REPLACE BOILER | $37,073 | $222,038 | n/a |
OR0802 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,248 | $147 | n/a |
OR0802 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,483 | $499 | n/a |
OR0802 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $2,952 | $500 | n/a |
AS0590 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $1,128 | n/a |
AS0590 # 05 Y:2024 | 05 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $196 | $299 | n/a |
AS0590 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,038 | $39 | n/a |
AS0590 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,979 | $93,198 | n/a |
AS0590 # 01 Y:2024 | 01 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,333 | $1,245 | n/a |
LS2408 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $135 | Implemented |
LS2408 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,002 | $144,549 | Implemented |
DL0238 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $21,276 | $7,300 | n/a |
DL0238 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $236,055 | $1,860,000 | n/a |
DL0238 # 07 Y:2024 | 07 | 2024 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $212,600 | $900,000 | n/a |