IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

905

matching recommendations
Reset
NAICS 31142 Fruit and Vegetable Canning, Pickling, and Drying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0590 # 01 Y:2024 01 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,333 $1,245 n/a
AS0590 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $3,038 $39 n/a
AS0590 # 05 Y:2024 05 2024 REDUCE HEAT GAIN BY WINDOW TINTING $196 $299 n/a
AS0590 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,979 $93,198 n/a
AS0590 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $1,128 n/a
LS2408 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $135 n/a
DL0238 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $21,276 $7,300 n/a
LS2408 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,002 $144,549 n/a
DL0238 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $40,888 $180,000 n/a
DL0238 # 06 Y:2024 06 2024 REPAIR AND ELIMINATE STEAM LEAKS $56,437 $22,000 n/a
DL0238 # 04 Y:2024 04 2024 REPAIR OR REPLACE STEAM TRAPS $112,874 $37,000 n/a
DL0238 # 01 Y:2024 01 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $236,055 $1,860,000 n/a
LS2408 # 03 Y:2024 03 2024 REPLACE BOILER $57,645 $247,500 n/a
DL0238 # 07 Y:2024 07 2024 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $212,600 $900,000 n/a
DL0238 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $205,595 $34,400 n/a
AS0577 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,281 $406 n/a
AS0577 # 09 Y:2024 09 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $388 $1,579 n/a
AS0577 # 07 Y:2024 07 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,172 $2,798 n/a
AS0577 # 06 Y:2024 06 2024 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,086 $15,866 n/a
AS0577 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $242,289 $2,885,843 n/a
AS0577 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $165,792 $921,043 n/a
AS0577 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $20,991 $20,000 n/a
AS0577 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,679 $30,000 n/a
AS0577 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,824 $34,114 n/a
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented