Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0704 # 06 Y:2018 | 06 | 2018 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $5,586 | $14,266 | Not Implemented |
OR0704 # 05 Y:2018 | 05 | 2018 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $12,192 | $2,161 | Not Implemented |
OR0704 # 04 Y:2018 | 04 | 2018 | MINIMIZE WATER USAGE | $28,545 | $540 | Not Implemented |
OR0704 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $40,837 | $72,155 | Not Implemented |
OR0704 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $127,144 | $201,450 | Implemented |
OR0704 # 01 Y:2018 | 01 | 2018 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $510,333 | $740,000 | Not Implemented |
OR0653 # 01 Y:2015 | 01 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $118,419 | $40,792 | Not Implemented |
OR0653 # 02 Y:2015 | 02 | 2015 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $36,536 | $30,728 | Not Implemented |
OR0653 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $3,897 | $4,580 | Not Implemented |
OR0653 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $611 | $1,058 | Not Implemented |
OR0653 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,262 | $15,398 | Not Implemented |
OR0653 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,625 | $1,000 | Not Implemented |
OR0503 # 01 Y:2006 | 01 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,500 | $42,500 | Implemented |
OR0503 # 07 Y:2006 | 07 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,700 | $18,300 | Not Implemented |
OR0503 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,341 | $600 | Implemented |
OR0503 # 05 Y:2006 | 05 | 2006 | MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING | $46,500 | $0 | Implemented |
OR0503 # 04 Y:2006 | 04 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $50,800 | $11,300 | Implemented |
OR0503 # 03 Y:2006 | 03 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $17,800 | $36,000 | Implemented |
OR0503 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $23,480 | $24,300 | Not Implemented |
OR0475 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,030 | $6,920 | Not Implemented |
OR0475 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,920 | $0 | Implemented |
OR0475 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $920 | $0 | Not Implemented |
OR0475 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,700 | $0 | Not Implemented |
OR0475 # 03 Y:2005 | 03 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,300 | $0 | Not Implemented |
OR0475 # 02 Y:2005 | 02 | 2005 | AVOID FROST FORMATION ON EVAPORATORS | $6,600 | $1,500 | Implemented |