IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0582 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,960 $0 Implemented
SF0582 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,094 $17,764 Implemented
SF0582 # 09 Y:2022 09 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,070 $11,782 Implemented
SF0582 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,257 $45,587 Implemented
SF0582 # 04 Y:2022 04 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,294 $2,290 Implemented
SF0582 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $29,881 $2,290 Implemented
SF0582 # 02 Y:2022 02 2022 MODIFY STARTUP/SHUTDOWN TIMES $7,144 $0 Implemented
SF0582 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,836 $41,117 Implemented
SF0549 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,214 Implemented
SF0549 # 08 Y:2020 08 2020 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $22,925 $1,810 Implemented
SF0549 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $403 $1,776 Implemented
SF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,204 $25,635 Implemented
SF0549 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,719 $0 Implemented
SF0486 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $833 $0 Implemented
SF0486 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,334 $11,830 Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented
SF0486 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $0 Implemented
SF0486 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $15,444 $46,053 Implemented
SF0481 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,477 $140 Implemented
SF0481 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,033 $0 Implemented
SF0481 # 09 Y:2016 09 2016 UPGRADE CONTROLS ON COMPRESSORS $48,481 $18,682 Implemented
SF0481 # 02 Y:2016 02 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,662 $0 Implemented
SF0481 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $105 Implemented
SF0481 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $660 $769 Implemented
SF0423 # 01 Y:2012 01 2012 CLOSE OFF UNNEEDED STEAM LINES $417 $0 Implemented