IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 311423 Dried and Dehydrated Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
AS0505 # 05 Y:2021 05 2021 KEEP EQUIPMENT CLEAN $4,063 $464 Implemented
AS0505 # 01 Y:2021 01 2021 USE LESS WASTEFUL PACKAGING $178,199 $183,215 Implemented
UF0513 # 04 Y:2017 04 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $7,542 $0 Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
SF0424 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,789 $0 Implemented
SF0424 # 03 Y:2013 03 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $10,307 $0 Implemented
SF0424 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $7,962 $46,705 Implemented
SF0424 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,423 $291,716 Implemented
MI0227 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,306 $12,160 Implemented
MI0227 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,886 $142,619 Implemented
MI0227 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,932 $19,454 Implemented
MI0227 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,918 $1,660 Implemented
MI0227 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $63,004 $11,425 Implemented
SF0413 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,499 $409,247 Implemented
SF0413 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $380 Implemented
SU0303 # 01 Y:2011 01 2011 INSULATE FEEDWATER TANK $273 $83 Implemented
SU0303 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $128 Implemented